> 2007 FHWA Seismic Accelerated Bridge Construction Workshop Outcomes and Follow-up Activities
Accelerated Bridge Construction
Fiber Reinforced Polymer Composites
High Performance Concrete
High Performance Steel
High Strength Bolts
LRFD
Prefabricated Bridge Elements and Systems
Segmental Concrete Bridge Technology
Seismic
Steel Fabrication
Tunnels
Next
>>
2007 FHWA Seismic Accelerated Bridge Construction Workshop Outcomes and Follow-up Activities
Rapid Bridge Construction: Seismic Connections Moderate-to-High Seismic Zones
San Diego, CA – Thursday, October 11, 2007
PDF Version
(581 KB)
TABLE OF CONTENTS
Background
Purpose
Process
Program
Outcomes
Post-earthquake accelerated column repair/replacement (B2)
Investigation of column seismic connections for ABC (C6, C8, and C10)
Response of segmental systems (C4a, b, c, and B5)
Connections – Ductile, Constructible, Rapid (C1b, D2, and E13)
Rocking columns (B6)
Segmental post-tensioned columns (connections) (F6)
Footing-to-Pile and Column-to-Foundation connections (F1 and F2)
Innovative materials (G1)
Segmental construction connection concepts (C3)
Long-term performance of SABC connections (G2)
Code recommendations for SABC (H6)
Follow-up Meetings
Conclusions
Seismic ABC Action Plan
LIST OF TABLES
TABLE 1. Workshop Steering Committee
TABLE 2. Presentations
TABLE 3. Brainstorming Idea Categories
TABLE 4. Seismic ABC research needs
LIST OF FIGURES
FIGURE 1. Segmental column idealization
FIGURE 2. Bonded/unbonded tendon performance
LIST OF APPENDICES
APPENDIX A - Participant List
APPENDIX B - Program
APPENDIX C - Presentation Summaries
APPENDIX D - Brainstorm Ideas: All Inclusive
APPENDIX E - Brainstorm Ideas: Seismic Connection Detailing Focus
APPENDIX F - Breakout Groups
APPENDIX G - Breakout Session Issue Template
APPENDIX H - Populated Issue Templates
Next
>>
PDF files can be viewed with the
Acrobat® Reader®
Events
View all Upcoming Structures Events
More Information
Accelerated Bridge Construction List
Accelerated Construction
Highways for LIFE
Prefabricated Bridge Elements and Systems
Contact
Reggie Holt
Office of Bridge Technology
202-366-4596
E-mail Reggie
This page last modified on 12/07/07