Bridge Technology
Search FHWA:
FHWA
>
Infrastructure
>
Bridge
What's New in Bridge
11/22/2011
Accelerated Bridge Construction: Experience in Design, Fabrication and Erection of Prefabricated Bridge Elements and Systems
11/15/2011
Revisions to the Recording and Coding Guide for the Structure, Inventory and Appraisal of the Nation’s Bridges (Coding Guide) Items 63 and 65, Method Used to Determine Operating and Inventory Ratings
10/27/2011
Assigned Load Ratings
10/27/2011
Bridge Inspection Program Responsibility of the States
09/13/2011
T 5140.32 Inspection of Fracture Critical Bridges Fabricated from AASHTO M270 Grade 100 (ASTM A514/A517) Steel
06/28/2011
Project Awards for the National Historic Covered Bridge Preservation Program - FY 2010
05/24/2011
Bridge Preservation Guide Maintaining State of Good Repair Using Cost Effective Investment Strategies
02/02/2011
Revisions to the Recording and Coding Guide for the Structure, Inventory and Appraisal of the Nation's Bridges (Coding Guide) - Item 31, Design Load, and Items 63 and 65, Method Used to Determine Operating and Inventory Ratings
10/21/10
HEC 26 Culvert Design for Aquautic Organism Passage
08/16/10
Webinar on Fiber-Reinforced Polymer Composite and Recycled Plastic
06/29/10
Drilled Shafts Construction Procedures and LRFD Design Methods
06/17/10
Solicitation for FY 2010 Candidates for the Innovative Bridge Research and Deployment (IBRD) Program (Reply Due: June 30, 2010)
06/11/10
Innovation in Vertical and Horizontal Construction: Lessons for the Transportation Industry Final Report
FHWA Home
|
Infrastructure Home
|
Bridge Home
|
Feedback